Using 3D models, U.S. Engineering completed the design of the mechanical and plumbing systems, and located in excess of 78,000 points for sleeves, embeds, floor penetrations, drains and hanger supports. The points located on the first and second floors of the hospital main building exceeded 38,000 points. … Thus far, we've realized incredible accuracy thanks to our 3D model-to-field workflow.” Jeff Kiblen is Integrated Technology Manager for U.S. Engineering.
Comments